DIY Life Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. USS Annapolis (SSN-760) - Wikipedia

    en.wikipedia.org/wiki/USS_Annapolis_(SSN-760)

    The contract to build USS Annapolis (SSN-760) was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 21 March 1986 and her keel was laid down on 15 June 1988. She was launched on 18 May 1991 sponsored by Mrs. Myra F. Kauderer, and commissioned on 11 April 1992, with Commander Richard Severinghaus in ...

  3. USS La Jolla - Wikipedia

    en.wikipedia.org/wiki/USS_La_Jolla

    12 officers, 98 men. USS La Jolla (SSN-701/MTS-701), a Los Angeles -class submarine, is named for La Jolla, California. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 10 December 1973 and her keel was laid down on 16 October 1976. She was launched on 11 August 1979 ...

  4. USS Greenling (SSN-614) - Wikipedia

    en.wikipedia.org/wiki/USS_Greenling_(SSN-614)

    Armament. • 4 × 21 in (533 mm) torpedo tubes. USS Greenling (SSN-614) was a Permit -class submarine. She was the second ship of the United States Navy to be named for the greenling, an elongated, fine-scaled fish found from Kamchatka to California. Her keel was laid down on 15 August 1961 by General Dynamics Electric Boat of Groton ...

  5. USS Seawolf (SSN-21) - Wikipedia

    en.wikipedia.org/wiki/USS_Seawolf_(SSN-21)

    The contract to build Seawolf was awarded to the Electric Boat Division of General Dynamics on 9 January 1989 and her keel was laid down on 25 October 1989. She was launched on 24 June 1995, sponsored by Mrs. Margaret Dalton, and commissioned on 19 July 1997. The 7-year 9-month time period from keel laying to commissioning is the longest for a ...

  6. USS Maine (SSBN-741) - Wikipedia

    en.wikipedia.org/wiki/USS_Maine_(SSBN-741)

    The contract to build Maine was awarded to the Electric Boat Division of the General Dynamics Corporation, Groton, Connecticut, on 5 October 1988, and her keel was laid there on 3 July 1990. Maine was launched on 16 July 1994, delivered to the U.S. Navy on 23 June 1995, and commissioned on 29 July 1995 at the Portsmouth Navy Yard , on the shore ...

  7. Seawolf-class submarine - Wikipedia

    en.wikipedia.org/wiki/Seawolf-class_submarine

    Seawolf class. The Seawolf class is a class of nuclear-powered, fast attack submarines (SSN) in service with the United States Navy. The class was the intended successor to the Los Angeles class, and design work began in 1983. [10] A fleet of 29 submarines was to be built over a ten-year period, but that was reduced to 12 submarines.

  8. USS Pasadena (SSN-752) - Wikipedia

    en.wikipedia.org/wiki/USS_Pasadena_(SSN-752)

    The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 30 November 1982 and her keel was laid down on 20 December 1985. She was launched on 12 September 1987 sponsored by Mrs. Pauline Trost, and commissioned on 11 February 1989 with Commander W. Fritchman in command.

  9. SSN(X)-class submarine - Wikipedia

    en.wikipedia.org/wiki/SSN(X)-class_submarine

    The SSN (X) or Next-Generation Attack Submarine program of the United States Navy aims to develop a new class of nuclear-powered attack submarines to succeed the Virginia and Seawolf classes. The SSN (X) program remains in the early stages of development and no official details have been released about its design or capabilities.