DIY Life Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. USS Greenling (SSN-614) - Wikipedia

    en.wikipedia.org/wiki/USS_Greenling_(SSN-614)

    Her keel was laid down on 15 August 1961 by General Dynamics Electric Boat of Groton, Connecticut. On 10 April 1963, Thresher , the lead ship of Greenling' s class , was lost due to severe design flaws in her non-nuclear piping systems.

  3. Asherah (submarine) - Wikipedia

    en.wikipedia.org/wiki/Asherah_(submarine)

    The two-person submarine was commissioned in 1963, built by the Electric Boat Division of General Dynamics in Groton, Connecticut, and launched on May 28, 1964. Asherah was 16 feet long, weighed 4.5 tons, and could move at up to 4 knots, powered by rechargeable batteries. She could dive to a depth of 600 feet (180 m).

  4. SSN (X)-class submarine - Wikipedia

    en.wikipedia.org/wiki/SSN(X)-class_submarine

    General Dynamics Electric Boat (expected) Huntington Ingalls Industries Newport News Shipbuilding (expected) Operators United States Navy: Preceded by: Virginia class: Cost: $5.6 billion to $7.2 billion per unit: Built: 2034 (planned) In service: 2042 (planned) General characteristics (conceptual) Type: Nuclear attack submarine: Propulsion ...

  5. Bath Iron Works - Wikipedia

    en.wikipedia.org/wiki/Bath_Iron_Works

    In 1995, Bath Iron Works was bought by General Dynamics. In 2001, the company wrapped up a four-year effort to build the Land Level Transfer Facility, an enormous concrete platform for final assembly of its ships, instead of building them on a sloping way so that they could slide into the Kennebec at launch.

  6. General Dynamics Mission Systems - Wikipedia

    en.wikipedia.org/wiki/General_Dynamics_Mission...

    General Dynamics is the Army's prime contractor for WIN-T, [15] which is part of General Dynamics Mission Systems' tactical voice and data communications systems, The Soldier's Network. [16] Increment 1, now fully deployed, began fielding in 2004 and completed fielding in 2012. [ 17 ]

  7. Electro-Dynamic Company - Wikipedia

    en.wikipedia.org/wiki/Electro-Dynamic_Company

    The company retained this function as a division of General Dynamics Corporation when that company was formed by a reorganization of Electric Boat in 1952. [2] The company was dissolved in 2000 and its functions were relocated to Electric Boat's main facility in Groton, Connecticut. [3] [4]

  8. USS Springfield (SSN-761) - Wikipedia

    en.wikipedia.org/wiki/USS_Springfield_(SSN-761)

    The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 21 March 1986, and her keel was laid down on 29 January 1990. She was launched on 4 January 1992 sponsored by Lynn Martin , and commissioned on 9 January 1993.

  9. List of ship launches in 2016 - Wikipedia

    en.wikipedia.org/wiki/List_of_ship_launches_in_2016

    General Dynamics Electric Boat: Groton: Colorado: Virginia-class submarine: For United States Navy: 31 December South Korea: Samsung Heavy Industries: OOCL Hong Kong: G-class container ship: For Orient Overseas Container Line [124] December France: Couach: Gujan-Mestras: Type 4400 FAST yacht [125] Unknown date United Kingdom: Alicat Workboats ...