Search results
Results From The WOW.Com Content Network
General Dynamics Electric Boat [2] ( GDEB) is a subsidiary of General Dynamics Corporation. It has been the primary builder of submarines for the United States Navy for more than 100 years. The company's main facilities are a shipyard in Groton, Connecticut, a hull-fabrication and outfitting facility in Quonset Point, Rhode Island, and a design and engineering facility in New London, Connecticut.
The contract to build Pennsylvania was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 29 November 1982 and her keel was laid down there on 10 January 1984. She was launched on 23 April 1988, sponsored by Mrs. Marilyn Garrett, and commissioned on 9 September 1989.
^ "Seawolf Class". General Dynamics Electric Boat. Archived from the original on 30 September 2011. Retrieved 5 August 2011.
The United States has two yards capable of building nuclear-powered submarines: General Dynamics’ Electric Boat Division (GD/EB) of Groton, CT, and Quonset Point, RI; and Huntington Ingalls Industries ’ Newport News Shipbuilding (HII/NNS), of Newport News, VA.
The contract to build Seawolf was awarded to the Electric Boat Division of General Dynamics on 9 January 1989 and her keel was laid down on 25 October 1989. She was launched on 24 June 1995, sponsored by Mrs. Margaret Dalton, and commissioned on 19 July 1997. The 7-year 9-month time period from keel laying to commissioning is the longest for a submarine in the U.S. Navy.
An electric boat is a powered watercraft driven by electric motors, which are powered by either on-board battery packs, solar panels or generators. [1] While a significant majority of water vessels are powered by diesel engines, with sail power and gasoline engines also popular, boats powered by electricity have been used for over 120 years.
The contract to build Maine was awarded to the Electric Boat Division of the General Dynamics Corporation, Groton, Connecticut, on 5 October 1988, and her keel was laid there on 3 July 1990. Maine was launched on 16 July 1994, delivered to the U.S. Navy on 23 June 1995, and commissioned on 29 July 1995 at the Portsmouth Navy Yard, on the shore of its namesake state.
The Victory Yard was a temporary expansion of the General Dynamics Electric Boat facility in Groton, Connecticut, to dramatically increase submarine construction during World War II .