DIY Life Web Search

  1. Ads

    related to: general dynamics electric boat careers

Search results

  1. Results From The WOW.Com Content Network
  2. USS Greenling (SSN-614) - Wikipedia

    en.wikipedia.org/wiki/USS_Greenling_(SSN-614)

    USS Greenling (SSN-614) was a Permit -class submarine. She was the second ship of the United States Navy to be named for the greenling, an elongated, fine-scaled fish found from Kamchatka to California. Her keel was laid down on 15 August 1961 by General Dynamics Electric Boat of Groton, Connecticut .

  3. General Dynamics UK - Wikipedia

    en.wikipedia.org/wiki/General_Dynamics_UK

    General Dynamics UK is the British subsidiary of the American defence and security corporation General Dynamics. Founded in London in 1962, the company has grown to include eight sites across the United Kingdom, including in Bristol, Chippenham, Hastings, Merthyr Tydfil, Oakdale and Rotherham. Specialising in armoured fighting vehicles, avionic ...

  4. USS Annapolis (SSN-760) - Wikipedia

    en.wikipedia.org/wiki/USS_Annapolis_(SSN-760)

    The contract to build USS Annapolis (SSN-760) was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 21 March 1986 and her keel was laid down on 15 June 1988. She was launched on 18 May 1991 sponsored by Mrs. Myra F. Kauderer, and commissioned on 11 April 1992, with Commander Richard Severinghaus in ...

  5. USS Hyman G. Rickover (SSN-795) - Wikipedia

    en.wikipedia.org/wiki/USS_Hyman_G._Rickover_(SSN...

    USS Hyman G. Rickover (SSN-795) at General Dynamics Electric Boat shipyard facility in Groton, Conn., July 31, 2021. USS Hyman G. Rickover (SSN-795), is a Virginia -class nuclear-powered attack submarine of the United States Navy and the second such boat commemorating Admiral Hyman G. Rickover, pioneer of the nuclear navy. [5]

  6. USS Seawolf (SSN-21) - Wikipedia

    en.wikipedia.org/wiki/USS_Seawolf_(SSN-21)

    The contract to build Seawolf was awarded to the Electric Boat Division of General Dynamics on 9 January 1989 and her keel was laid down on 25 October 1989. She was launched on 24 June 1995, sponsored by Mrs. Margaret Dalton, and commissioned on 19 July 1997. The 7-year 9-month time period from keel laying to commissioning is the longest for a ...

  7. Frank Cable - Wikipedia

    en.wikipedia.org/wiki/Frank_Cable

    The NELSECO plant was located on the eastern bank of the Thames River in Groton, Connecticut where the General Dynamics Electric Boat Division yard is today (2018). Cable served as the vice-president and general manager of NELSECO until its merger with Electric Boat in 1930. Cable was appointed general manager of Electric Boat following the merger.

  1. Ads

    related to: general dynamics electric boat careers