Search results
Results From The WOW.Com Content Network
Electric Boat changed its name to General Dynamics in 1952 under the company's new chairman and CEO, John Jay Hopkins. Honors. The submarine tender USS L. Y. Spear (AS-36), built by the General Dynamics Shipbuilding Division in Quincy, Massachusetts, was named after him. References Notes
The MOD also enlisted the advice and expertise of General Dynamics Electric Boat through a U.S. Navy contract. [16] Eventually, a General Dynamics Electric Boat employee became the Astute Project Director at Barrow. [9] Audacious under construction
On 5 October 2019, Mrs Richardson christened Oregon at Electric Boat in Groton, Connecticut. [5] The ship was commissioned on 28 May 2022 at Naval Submarine Base New London. [3] A contract modification for Oregon SSN-793, Montana (SSN-794), and Hyman G. Rickover (SSN-795) was initially awarded to Electric Boat for US$594.7 million
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 21 March 1986, and her keel was laid down on 29 January 1990. She was launched on 4 January 1992 sponsored by Lynn Martin , and commissioned on 9 January 1993.
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 3 May 1991 and her keel was laid down on 14 September 1992. She was launched on 1 September 1997, sponsored by Patricia L. Rowland, wife of the Governor of Connecticut, John G. Rowland , and commissioned on 11 December ...
Cable was employed by the Electro-Dynamic Company owned by financier Isaac Rice and William Woodnut Griscom.Rice was a financial supporter of inventor John Phillip Holland, whose Holland Torpedo Boat Company (the forerunner and precursor to the Electric Boat Division of General Dynamics Corporation) was developing a prototype submarine, Holland VI, for the United States Navy.
Her keel was laid down on 15 August 1961 by General Dynamics Electric Boat of Groton, Connecticut. On 10 April 1963, Thresher , the lead ship of Greenling' s class , was lost due to severe design flaws in her non-nuclear piping systems.
In 1995, Bath Iron Works was bought by General Dynamics. In 2001, the company wrapped up a four-year effort to build the Land Level Transfer Facility, an enormous concrete platform for final assembly of its ships, instead of building them on a sloping way so that they could slide into the Kennebec at launch.