DIY Life Web Search

  1. Ads

    related to: general dynamics electric boat division groton ct

Search results

  1. Results From The WOW.Com Content Network
  2. Electro-Dynamic Company - Wikipedia

    en.wikipedia.org/wiki/Electro-Dynamic_Company

    The company retained this function as a division of General Dynamics Corporation when that company was formed by a reorganization of Electric Boat in 1952. [2] The company was dissolved in 2000 and its functions were relocated to Electric Boat's main facility in Groton, Connecticut. [3] [4]

  3. USS Whale (SSN-638) - Wikipedia

    en.wikipedia.org/wiki/USS_Whale_(SSN-638)

    Following two months of local operations out of Charleston, Whale sailed for Groton, Connecticut, and her post-shakedown repair period. After three months in the shipyard of the Electric Boat Division of the General Dynamics Corporation, at Groton, she started back to Charleston, on 16 October 1969. She arrived at Charleston, on 20 October, and ...

  4. Asherah (submarine) - Wikipedia

    en.wikipedia.org/wiki/Asherah_(submarine)

    The two-person submarine was commissioned in 1963, built by the Electric Boat Division of General Dynamics in Groton, Connecticut, and launched on May 28, 1964. Asherah was 16 feet long, weighed 4.5 tons, and could move at up to 4 knots, powered by rechargeable batteries. She could dive to a depth of 600 feet (180 m).

  5. Victory Yard - Wikipedia

    en.wikipedia.org/wiki/Victory_Yard

    On 5 February 1942, the US Navy purchased the former Groton Iron Works property from Alfred Holter and Shell Oil Company for $222,000 using condemnation proceedings. [1] $9.5 million was spent to construct the Victory Yard, where General Dynamics Electric Boat began building submarines on 22 July 1942. [2]

  6. Shippingport (ARDM-4) - Wikipedia

    en.wikipedia.org/wiki/Shippingport_(ARDM-4)

    In October 2010, while Shippingport (ARDM-4) was nearing the end of her overhaul at BAE Systems Ship Repair at Norfolk, Virginia, [1] the U.S. Department of Defense announced that General Dynamics Electric Boat was awarded an additional $6.5 million to its contract for ship forces duties during Shippingport's naval service craft overhaul (SCO ...

  7. USS Trepang (SSN-674) - Wikipedia

    en.wikipedia.org/wiki/USS_Trepang_(SSN-674)

    The contract to build Trepang was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 28 October 1967. She was launched on 27 September 1969, sponsored by Mrs. Melvin R. Laird, the wife of United States Secretary of Defense Melvin R. Laird , and ...

  8. USS Tennessee (SSBN-734) - Wikipedia

    en.wikipedia.org/wiki/USS_Tennessee_(SSBN-734)

    Tennessee 's construction was authorized in fiscal year 1980, and the contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 7 January 1982. Her keel was laid down there on 9 June 1986.

  9. USS Silversides (SSN-679) - Wikipedia

    en.wikipedia.org/wiki/USS_Silversides_(SSN-679)

    The contract to build Silversides was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 25 June 1968 and her keel was laid down on 13 October 1969. She was launched on 4 June 1971, sponsored by Mrs. John H. Chafee , wife of then- Secretary of the Navy John H. Chafee (1922–1999), and commissioned ...

  1. Ads

    related to: general dynamics electric boat division groton ct