Ad
related to: general dynamics electric boat division retirement benefits
Search results
Results From The WOW.Com Content Network
William Alison Anders was born in Hong Kong on 17 October 1933, the son of Arthur F. Anders, a United States Navy lieutenant, and his wife, Muriel née Adams.The family moved from Hong Kong to Annapolis, Maryland, where his father taught mathematics at the U.S. Naval Postgraduate School.
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 1 July 1974 and her keel was laid down on 10 April 1976 by Mrs. Robert A. Taft, JR., wife of Senator Robert Taft Jr. of Ohio. [7]
USS Columbus (SSN-762) is a Los Angeles-class nuclear powered fast attack submarine and the second vessel of the United States Navy to be named for Columbus, Ohio.The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 21 March 1986 and her keel was laid down on 9 January 1991.
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 30 November 1982 and her keel was laid down on 20 December 1985. She was launched on 12 September 1987 sponsored by Mrs. Pauline Trost, and commissioned on 11 February 1989 with Commander W. Fritchman in command.
Tennessee 's construction was authorized in fiscal year 1980, and the contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 7 January 1982. Her keel was laid down there on 9 June 1986.
Nautilus ' s keel was laid at General Dynamics' Electric Boat Division in Groton, Connecticut, by Harry S. Truman on 14 June 1952. [13] She was christened on 21 January 1954 and launched into the Thames River, sponsored by Mamie Eisenhower. Nautilus was commissioned on 30 September 1954, under the command of Commander Eugene P. Wilkinson, USN. [2]
In 1995, Bath Iron Works was bought by General Dynamics. In 2001, the company wrapped up a four-year effort to build the Land Level Transfer Facility, an enormous concrete platform for final assembly of its ships, instead of building them on a sloping way so that they could slide into the Kennebec at launch.
The keel laying ceremony took place 24 August 2020 at the Quonset Point Facility of General Dynamics Electric Boat in North Kingstown, Rhode Island. [5] Idaho is projected to cost around $2.6 billion dollars and to be commissioned in 2025.
Ad
related to: general dynamics electric boat division retirement benefits