DIY Life Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. SSN (X)-class submarine - Wikipedia

    en.wikipedia.org/wiki/SSN(X)-class_submarine

    General Dynamics Electric Boat (expected) Huntington Ingalls Industries Newport News Shipbuilding (expected) Operators United States Navy: Preceded by: Virginia class: Cost: $5.6 billion to $7.2 billion per unit: Built: 2034 (planned) In service: 2042 (planned) General characteristics (conceptual) Type: Nuclear attack submarine: Propulsion ...

  3. USS Springfield (SSN-761) - Wikipedia

    en.wikipedia.org/wiki/USS_Springfield_(SSN-761)

    The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 21 March 1986, and her keel was laid down on 29 January 1990. She was launched on 4 January 1992 sponsored by Lynn Martin , and commissioned on 9 January 1993.

  4. USS Greenling (SSN-614) - Wikipedia

    en.wikipedia.org/wiki/USS_Greenling_(SSN-614)

    Her keel was laid down on 15 August 1961 by General Dynamics Electric Boat of Groton, Connecticut. On 10 April 1963, Thresher , the lead ship of Greenling' s class , was lost due to severe design flaws in her non-nuclear piping systems.

  5. John Philip Holland - Wikipedia

    en.wikipedia.org/wiki/John_Philip_Holland

    International Directory of Company Histories, Volume 86 under General Dynamics/Electric Boat Corporation, July 2007, St. James Press/Thomposon Gale Group, pp. 136–139 The Defender, The Story of General Dynamics , by Roger Franklin.

  6. Electric boat - Wikipedia

    en.wikipedia.org/wiki/Electric_boat

    An electric boat is a powered watercraft driven by electric motors, which are powered by either on-board battery packs, solar panels or generators. [ 1 ] While a significant majority of water vessels are powered by diesel engines , with sail power and gasoline engines also popular, boats powered by electricity have been used for over 120 years.

  7. USS Maine (SSBN-741) - Wikipedia

    en.wikipedia.org/wiki/USS_Maine_(SSBN-741)

    The contract to build Maine was awarded to the Electric Boat Division of the General Dynamics Corporation, Groton, Connecticut, on 5 October 1988, and her keel was laid there on 3 July 1990. Maine was launched on 16 July 1994, delivered to the U.S. Navy on 23 June 1995, and commissioned on 29 July 1995 at the Portsmouth Navy Yard , on the shore ...

  8. David S. Lewis - Wikipedia

    en.wikipedia.org/wiki/David_S._Lewis

    He remained head of the company until he retired in 1986, following pressure from a congressional subcommittee investigating fraud at General Dynamics, specifically the Electric Boat Division involving submarine contracts and cost overruns. [7] Upon his retirement, the investigation was halted and he remained on the board of directors through 1993.

  9. Columbia-class submarine - Wikipedia

    en.wikipedia.org/wiki/Columbia-class_submarine

    In December 2008, General Dynamics Electric Boat Corporation was selected to design the Common Missile Compartment that will be used on the Ohio-class successor. [36] In 2012, the U.S. Navy announced plans for its SSBN(X) to share a common missile compartment (CMC) design with the Royal Navy's Dreadnought-class ballistic missile submarine. [5]