Search results
Results From The WOW.Com Content Network
General Dynamics Electric Boat [2] ( GDEB) is a subsidiary of General Dynamics Corporation. It has been the primary builder of submarines for the United States Navy for more than 100 years. The company's main facilities are a shipyard in Groton, Connecticut, a hull-fabrication and outfitting facility in Quonset Point, Rhode Island, and a design ...
General Dynamics. General Dynamics Corporation ( GD) is an American publicly traded aerospace and defense corporation headquartered in Reston, Virginia. As of 2020, it was the fifth-largest defense contractor in the world by arms sales, and fifth largest in the United States by total sales. [2]
On 1 December 1976 General Dynamics Electric Boat (GDEB) submitted a $544 million claim related to its contract for 18 Los-Angeles-class submarines; the contractor alleged the USN made an undue amount of design changes while the government argued that Electric Boat mismanaged its operations.
The Astute class are built at the Devonshire Dock Hall, Barrow-in-Furness. In November 1999, British Aerospace purchased GEC-Marconi and created BAE Systems. At the time of the takeover, it had been approximately 20 years since the Vanguard class were designed, and the last of the boats had already been launched. [9]
For the company called "Electric Boat", see General Dynamics Electric Boat. In 2012, PlanetSolar became the first ever solar electric vehicle to circumnavigate the globe. An electric boat is a powered watercraft driven by electric motors, which are powered by either on-board battery packs, solar panels or generators. [1]
On 22 March 2021, the U.S. Navy added the 10th boat of the Block V series of the Virginia -class attack submarine, issuing a $2.4 billion adjustment on the December 2019 contract. This brings the total cost of the contract with prime contractor General Dynamics Electric Boat to $24.1 billion.
Seawolf class. The Seawolf class is a class of nuclear-powered, fast attack submarines (SSN) in service with the United States Navy. The class was the intended successor to the Los Angeles class, and design work began in 1983. [10] A fleet of 29 submarines was to be built over a ten-year period, but that was reduced to 12 submarines.
He remained head of the company until he retired in 1986, following pressure from a congressional subcommittee investigating fraud at General Dynamics, specifically the Electric Boat Division involving submarine contracts and cost overruns. Upon his retirement, the investigation was halted and he remained on the board of directors through 1993.