Ads
related to: general dynamics electric boat division
Search results
Results From The WOW.Com Content Network
USS Omaha (SSN-692), a Los Angeles-class submarine, was the third ship of the United States Navy to be named for Omaha, Nebraska.The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 31 January 1971 and her keel was laid down on 27 January 1973.
The two-person submarine was commissioned in 1963, built by the Electric Boat Division of General Dynamics in Groton, Connecticut, and launched on May 28, 1964. Asherah was 16 feet long, weighed 4.5 tons, and could move at up to 4 knots, powered by rechargeable batteries. She could dive to a depth of 600 feet (180 m).
J. William Jones, President of the company, stated that the yard was purchased in order to provide its Electric Boat division with increased flexibility. The yard was purchased for $5 million (equivalent to $49.1 million in today's dollars), [4] and Electric Boat managed the yard until its reorganization. Immediately, the yard was closed by ...
The contract to build Seawolf was awarded to the Electric Boat Division of General Dynamics on 9 January 1989 and her keel was laid down on 25 October 1989. She was launched on 24 June 1995, sponsored by Mrs. Margaret Dalton, and commissioned on 19 July 1997. The 7-year 9-month time period from keel laying to commissioning is the longest for a ...
Tennessee 's construction was authorized in fiscal year 1980, and the contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 7 January 1982. Her keel was laid down there on 9 June 1986.
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 30 November 1982 and her keel was laid down on 20 December 1985. She was launched on 12 September 1987 sponsored by Mrs. Pauline Trost, and commissioned on 11 February 1989 with Commander W. Fritchman in command.
The contract to build Missouri was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 14 August 2003. Her keel was laid down on 27 September 2008. [ 1 ] The submarine was placed in the water on 20 November 2009, and christened on 5 December 2009.
After three months in the shipyard of the Electric Boat Division of the General Dynamics Corporation, at Groton, she started back to Charleston, on 16 October 1969. She arrived at Charleston, on 20 October, and conducted local operations for the remainder of 1969.
Ads
related to: general dynamics electric boat division