Ad
related to: general dynamics electric boat divisionclearancejobs.com has been visited by 10K+ users in the past month
- Join Now
Apply Today & Join the Leader
in Defense & Intel Careers.
- Need Cleared Talent?
Staffing & Recruiting Solutions
#1 Cleared Recruiting Source
- Learn More
Why ClearanceJobs is the #1
security-cleared recruiting source.
- Career Networking
Connect with defense & intelligence
recruiters on ClearanceJobs.
- Join Now
Search results
Results From The WOW.Com Content Network
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 30 November 1982 and her keel was laid down on 20 December 1985. She was launched on 12 September 1987 sponsored by Mrs. Pauline Trost, and commissioned on 11 February 1989 with Commander W. Fritchman in command.
She had the capability to provide logistic and technical support for as many as 12 submarines and service four of them alongside simultaneously. L. Y. Spear was decommissioned on 6 September 1996 and struck from the Navy Register on 3 May 1999. She was berthed at the Norfolk Naval Shipyard in Portsmouth, Virginia, from 1999 till 2010.
The contract to build Pargo was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 26 March 1963 and her keel was laid down there on 3 June 1964. She was launched on 17 September 1966, sponsored by Mrs. Jean Gordon Holloway (née Hagood), the wife of retired Admiral James L. Holloway, Jr. (1898 ...
Her keel was laid down by the Electric Boat Division of the General Dynamics Corporation at Groton, Connecticut, on 22 April 1986. Christening and launching [ edit ] Maryland was christened and launched on 10 August 1991 during a ceremony held at the Electric Boat shipyard .
The contract to build Pennsylvania was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 29 November 1982 and her keel was laid down there on 10 January 1984. She was launched on 23 April 1988, sponsored by Mrs. Marilyn Garrett, and commissioned on 9 September 1989.
Although it was a Sturgeon class design, Cavalla was a modified "long hull" boat, approximately 10 feet (3.0 m) longer than the earlier ships in its class. Construction and commissioning [ edit ] The contract to build Cavalla was awarded to the Electric Boat Division of General Dynamics Corporation in Groton , Connecticut , on 24 July 1968 and ...
Ad
related to: general dynamics electric boat divisionclearancejobs.com has been visited by 10K+ users in the past month