DIY Life Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. USS Darter (SS-576) - Wikipedia

    en.wikipedia.org/wiki/USS_Darter_(SS-576)

    The contract to build Darter was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 30 June 1954 and her keel was laid down on 10 November 1954. She was launched on 28 May 1956 sponsored by Mrs. G.L. Russell, and commissioned on 20 October 1956.

  3. USS Flasher (SSN-613) - Wikipedia

    en.wikipedia.org/wiki/USS_Flasher_(SSN-613)

    The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 9 June 1960 and her keel was laid down on 14 April 1961. Originally laid down as the eleventh submarine in the Thresher-class building program, Flasher was extensively modified during the construction period. These ...

  4. USS Phoenix (SSN-702) - Wikipedia

    en.wikipedia.org/wiki/USS_Phoenix_(SSN-702)

    The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 31 October 1973, and her keel was laid down on 30 July 1977. She was launched on 8 December 1979, sponsored by Mrs. Betty Harvey Rhodes, wife of Congressman John J. Rhodes , and commissioned on 19 December 1981.

  5. USS Pargo (SSN-650) - Wikipedia

    en.wikipedia.org/wiki/USS_Pargo_(SSN-650)

    The contract to build Pargo was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 26 March 1963 and her keel was laid down there on 3 June 1964. She was launched on 17 September 1966, sponsored by Mrs. Jean Gordon Holloway (née Hagood), the wife of retired Admiral James L. Holloway, Jr. (1898 ...

  6. USS Hawaii (SSN-776) - Wikipedia

    en.wikipedia.org/wiki/USS_Hawaii_(SSN-776)

    The building contract was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 30 September 1998 and her keel was laid down on 27 August 2004. She was christened on 17 June 2006 by her sponsor, Governor Linda Lingle of Hawaii. Electric Boat delivered Hawaii to the US Navy on 22 December 2006, ahead of ...

  7. USS Maine (SSBN-741) - Wikipedia

    en.wikipedia.org/wiki/USS_Maine_(SSBN-741)

    The contract to build Maine was awarded to the Electric Boat Division of the General Dynamics Corporation, Groton, Connecticut, on 5 October 1988, and her keel was laid there on 3 July 1990. Maine was launched on 16 July 1994, delivered to the U.S. Navy on 23 June 1995, and commissioned on 29 July 1995 at the Portsmouth Navy Yard , on the shore ...

  8. Victory Yard - Wikipedia

    en.wikipedia.org/wiki/Victory_Yard

    On 5 February 1942, the US Navy purchased the former Groton Iron Works property from Alfred Holter and Shell Oil Company for $222,000 using condemnation proceedings. [1] $9.5 million was spent to construct the Victory Yard, where General Dynamics Electric Boat began building submarines on 22 July 1942. [2]

  9. USS Flying Fish (SSN-673) - Wikipedia

    en.wikipedia.org/wiki/USS_Flying_Fish_(SSN-673)

    The contract to build Flying Fish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 30 June 1967. She was launched on 17 May 1969, sponsored by Mrs. John W. Harvey, widow of the last commanding officer of USS THRESHER, and commissioned on 29 ...