Ads
related to: general dynamics electric boat company store near meovertons.com has been visited by 10K+ users in the past month
Search results
Results From The WOW.Com Content Network
International Directory of Company Histories, Volume 86 under General Dynamics/Electric Boat Corporation, July 2007, St. James Press/Thomposon Gale Group, pp. 136–139 The Defender, The Story of General Dynamics , by Roger Franklin.
Language links are at the top of the page. Search. Search
The shipyard traces its beginnings back to 1882, when Thomas A. Watson purchased a farm alongside the Fore River in East Braintree, Massachusetts.In 1884, Watson attempted to farm the land, but soon realizing that it was a failure, decided to work on a steam engine after he was approached by a local businessman.
The contract to build Jimmy Carter was to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 29 June 1996, and her keel was laid on 5 December 1998. Original schedules called for Jimmy Carter to be commissioned in late 2001 or early 2002.
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 21 March 1986, and her keel was laid down on 29 January 1990. She was launched on 4 January 1992 sponsored by Lynn Martin , and commissioned on 9 January 1993.
General Dynamics: Designed: 1969: Manufacturer: General Dynamics: Unit cost: 5 × Block 1B £8.56M each to UK; 9 × Block 1B US$13.66M each for SK; 13 × Mk 15 Block 1B Baseline 2 for TW, total cost: US$416M with 260,000 × Mk 244 Mod 0 armor-piercing bullet. 8 sets are for upgrading the current Block 0 to MK15 Phalanx Block 1B Baseline 2. [1 ...
Ads
related to: general dynamics electric boat company store near meovertons.com has been visited by 10K+ users in the past month